- Features
- Base materials: Concrete (cracked), Concrete (uncracked)
- Base material condition: Dry, Submerged, Water-filled, Wet
- Approvals / Test reports: ICC-ES report (concrete)
- High performance and technical superiority as per international approvals
- Suitable for diamond-cored holes – when prepared using the TE-YRT roughening tool
- Injectable epoxy suitable for all-year use – cures at temperatures down to -5°C / 23°F
- Longer working time – allows greater flexibility during installation
- Suitable for water-filled holes and underwater applications
- Applications: Structural connections with post-installed rebar (e.g. extension/connection to walls, slabs, stairs, columns, foundations, etc.). Structural renovation of buildings, bridges and other civil structures, retrofitting and re-strengthening of concrete members possible. Anchoring structural steel connections (e.g. steel columns, beams, etc.). Fastenings requiring seismic qualification. Fastening in natural stone and wood, including GLT and CLT made by spruce, pine or fir.